Tile Installation and Renovation FAQs
What should I look for when hiring a tile contractor?
Look for a contractor with experience in projects similar to yours, examples of completed work, and clear communication about preparation, materials, and installation.
A quality installation involves more than straight grout lines. Ask how the contractor will assess the existing surfaces, address waterproofing where needed, and finish edges and transitions. Request a written quote, confirm insurance coverage, and discuss the warranty and its exclusions before work begins.
How much does professional tile installation cost in the Lower Mainland?
Professional tile installation in the Lower Mainland is priced according to the work involved. The area being tiled, tile size and material, layout, surface condition, access, and finishing details all affect the cost.
Square footage alone doesn’t tell the whole story. A small shower with waterproofing, a niche, and detailed cuts may require more work than a larger, straightforward floor.
For a useful estimate, send Bomex current photos, approximate measurements, and your tile selections or inspiration images. Let us know whether you also need demolition, preparation, or renovation services.
What should a tile installation quote include?
A tile installation quote should clearly describe the areas being tiled, the proposed installation, and who is supplying the tile and other materials.
Depending on the project, it may include:
– Demolition and disposal.
– Surface preparation and levelling.
– The waterproofing system being installed.
– Shower drain style, such as a centre or linear drain.
– Shower niches, shelves, benches, and curb details.
– Setting materials, grout, and tile edge finishes.
– Sealer where appropriate.
– In-floor heating.
These details should be identified so you understand what is included. Exclusions and allowances should also be clear, along with how unexpected conditions or requested changes will be handled.
When comparing quotes, check that they cover the same work, materials, and finishing details. A lower price may reflect a different scope.
Can new tile be installed over existing tile?
Sometimes, but the existing installation must be assessed first. The tile needs to be firmly bonded, and the underlying surface must be suitable for the proposed installation. The preparation and installation products must also be approved for that application.
Adding another layer raises the finished surface, which can affect doors, thresholds, fixtures, and transitions to adjoining floors.
Tiling over existing tile does not resolve underlying movement, loose tiles, or moisture problems. Bomex can assess whether keeping the existing tile is appropriate or whether removal is the better approach.
Can loose or cracked tiles be repaired individually?
Individual tiles can sometimes be replaced if the damage is isolated and the surrounding installation is sound. Having spare matching tiles makes this easier, although new grout may not match the existing colour exactly.
Before recommending a repair, we consider what may have caused the failure. Movement, poor bonding, or moisture problems can mean the issue extends beyond the visibly damaged tile.
In showers, removing tile can also affect the waterproofing beneath it. We’ll discuss the limitations of a localized repair and whether a larger scope may be necessary.
How long does a shower or bathroom tile installation take?
The timeline depends on the size of the space, the amount of preparation, the tile layout, and the details involved. Demolition, repairs, waterproofing, niches, and intricate patterns can all add time.
Installation time is also different from the time until the space is ready to use. Mortars, grouts, sealants, and waterproofing products have specific setting or curing requirements.
Bomex will discuss the expected schedule for your project and explain when the finished area can be used. For a full bathroom renovation, the schedule must also account for other trades and material deliveries.
Should I buy my tile before hiring an installer?
You can, but speaking with your installer before ordering may help you avoid unsuitable selections or ordering the wrong quantity.
Tile size, material, thickness, and pattern can affect preparation, installation cost, and finishing details. Shower floors and sloped areas also need tile that suits the proposed design and installation system.
If you’ve already purchased tile, send us the product information, dimensions, and quantity available. If you’re still choosing, we can help you consider the installation requirements before you order.
Does a tile contractor handle demolition and floor preparation?
Some do, but these services should be confirmed in the quote. Bomex can include demolition and preparation where they form part of the agreed project scope.
Preparation may involve removing existing finishes, grinding old setting materials, or addressing uneven surfaces before installation. More substantial repairs may require additional work or another trade.
Because some conditions only become visible after demolition, we’ll discuss any newly discovered issues and obtain approval for additional work before proceeding.